Driving Directions from Peenya 1st Stage to
Kammasandra (Tumkur Road)
Strat from Peenya 1st Stage
Then go 0.7 K.M. to
Jalahalli Cross
Then go 0.69 K.M. to
Dasarahalli (Tumkur Road)
Then go 0.66 K.M. to
Tumkur Road 8th Mile
Then go 1.17 K.M. to
Widia Factory
Then go 0.54 K.M. to
Morrison Factory
Then go 0.55 K.M. to
Chikkabidarakallu
Then go 0.47 K.M. to
Jindal Factory
Then go 0.45 K.M. to
Anchepalya (Tumkur Road)
Then go 0.39 K.M. to
Bangalore International Exhibition Centre
Then go 0.28 K.M. to
Madavara
Then go 0.79 K.M. to
Tci (Tumkur Road)
Then go 0.64 K.M. to
Madanayakanahalli
Then go 3.74 K.M. to
Kammasandra (Tumkur Road)
Note:These Directions are extracted from BMTC Route 263K .
One ways are not considered while preparing route
|
CLICK HERE TO VIEW IT ON MAP
|
|