Driving Directions from Bagur to
Chandapura Railway Overbridge
Strat from Bagur
Then go 2.46 K.M. to
Mugalur
Then go 5.34 K.M. to
Sarjapur
Then go 2.81 K.M. to
Billapura
Then go 0.71 K.M. to
Thyvakanahalli
Then go 1.55 K.M. to
Bhel Navaratna Layout Cross
Then go 1.12 K.M. to
Bidaraguppe
Then go 2.29 K.M. to
Indlabele
Then go 1.07 K.M. to
Attibele
Then go 0.87 K.M. to
Attibele Checkpost
Then go 1.5 K.M. to
Yadavanahalli
Then go 0.83 K.M. to
Guest Line Hotel (Attibele)
Then go 0.7 K.M. to
Guddahatti Gate
Then go 1.02 K.M. to
Neraluru
Then go 0.86 K.M. to
Thirumagondanahalli
Then go 1.56 K.M. to
Chandapura Railway Overbridge
Note:These Directions are extracted from BMTC Route 399E .
One ways are not considered while preparing route
|
CLICK HERE TO VIEW IT ON MAP
|
|